Responsive repair services trusted by local authorities and housing providers across the UK





Responsive property repairs for landlords, housing providers, and local authorities.
GME Group delivers expert responsive repairs and maintenance services to keep properties safe, compliant, and in good condition. From routine fixes to urgent void works, our skilled team ensures homes and buildings are restored quickly and to the highest standards.
We go beyond patchwork fixes — offering a full range of responsive maintenance services designed to resolve issues quickly and reduce future disruption. Our directly employed team handles repairs across all major trades, ensuring consistency, quality, and peace of mind for landlords and tenants alike.
We repair external features such as fences, gates, paths, and communal spaces to ensure safe, presentable outdoor areas.
We identify causes of moisture and apply treatments to protect surfaces, improve air quality, and prevent reoccurrence.
We fix or replace kitchen units, staircases, internal doors, and built-in features with precision craftsmanship.
Our plastering specialists repair and smooth walls and ceilings to a clean finish, ready for decoration.
From damaged doors and windows to broken flooring, we carry out general repairs to restore structural integrity and usability.
We refresh both interiors and exteriors with durable, high-quality paintwork tailored to the needs of each property.
We’ve streamlined the decorating process to make it as easy as possible for homeowners to achieve a fresh new look without upfront costs. From your initial enquiry through to the final brushstroke, our team ensures clarity, care, and quality at every step. Once your plan is agreed, we’ll get to work with minimal disruption — all while you spread the cost over affordable weekly payments.
We follow a tried-and-tested approach to ensure consistent, high-quality results in every home we decorate:
Transparent pricing based on your home size
Kitchen, living room, dining room, hallway, stairs, landing, 3 bedrooms, 1 bathroom
88 sq m. (charged per sq m. for more)
£3,000 (£34 per sq m.)
Approx 5 days
£57.00 per week
Kitchen, living room, dining room, hallway, stairs, landing, 4 bedrooms, 1 bathroom, 1 en suite, downstairs WC (if applicable)
147 sq m. (charged per sq m. for more)
£4,998 (£34 per sq m.)
Approx 7 days
£96.00 per week
Kitchen, living room, dining room, hallway, stairs, landing, 5 bedrooms, 1 bathroom, 2 en suites
190 sq m. (charged per sq m. for more)
£7,000 (£36 per sq m.)
Approx 10 days
£134.00 per week
Moisture 101
Most mould issues start with excess moisture — often caused by everyday household activities. Even well-maintained homes can face moisture overload when ventilation is inadequate.
Without proper ventilation and moisture control, this vapour settles on cold surfaces, turning into condensation — and creating the perfect breeding ground for mould. That’s why GME’s service targets both cause and consequence, combining treatment with long-term prevention.
Drying clothes indoors
Cooking & boiling a kettle
Breathing (people at home)
Washing dishes
Bathing or showering
Mopping floors / cleaning surfaces
Up to 23 pints (≈10.9 litres) of extra water vapour released into the air every day.
When people talk about Awaab’s Law, the conversation usually goes straight to the deadlines. I’d start with when the clock starts instead.
The law has applied to social landlords in England since 27 October 2025, and it runs from the day you become aware of the problem. For most landlords, that’s the day the tenant rings up, well before a contractor has the job.
to investigate a significant hazard
for the tenant’s written summary, once the investigation finishes
to make the home safe if there’s a significant risk to health
for both the investigation and the safety work in an emergency
If that can’t be done in time, the landlord pays for the household to stay somewhere suitable until it is.
From 30 November 2026, Phase 2 applies these same timescales to more hazards, including excess cold, falls, fire and electrical safety.
What changes in Phase 2Picture a fairly standard repair route. The report’s logged and sits until someone triages it, a surveyor’s booked, their notes turn into a works order, the order goes out to a contractor and the contractor rings the tenant to sort access.
Every one of those steps is somebody waiting on somebody else, and almost all of it happens before anyone has stood in the room and looked at the wall. It was slow before. Now it can use up the whole ten days on its own.
Then there’s the paperwork. If a landlord’s ever asked to show what was found, what was done and when, our records become their records, and a job sheet that just says “mould treated” won’t stand up to that.
between every step, before anyone has looked at the wall
This is the bit I’d worry about if I were running a housing team.
Once the deadline becomes the target, the job shrinks to wipe it down, stain block it, repaint and close the ticket. It looks fine at sign-off, and then in February the black spots are back above the window, the tenant reports it again and a new ten days starts on the same wall.

The landlords handling this best have cut steps out of the route:
One visit diagnoses the problem and, where it can, treats it there and then.
Photos and moisture readings are logged against the property with dates as the work happens, rather than written up from memory a week later.
Finding the cause is in the brief from day one, so nobody has to argue about whether it’s in scope.
We’ve been working on mould eradication with councils and housing providers since 2016. If you’d like to put your own process up against the timescales, our mould team will walk through it with you.
Talk to our mould team.jpg)
With extensive experience working on live properties and void refurbishments, GME Group is the trusted maintenance partner for local councils, housing associations, and property managers. We meet the highest standards for quality, safety, and tenant care.























The things clients ask us most before booking a site visit.
Speak to the person who'll quote your job. No call centre, no hard sell.

Mr Samuel David Peel, trading as CP Business Finance (FRN: 1034961), is an appointed representative of White Rose Finance Group Limited (FRN: 630772), which is directly authorised and regulated by the Financial Conduct Authority. CP Business Finance acts as a credit broker, not a lender. Please consider borrowing decisions carefully — property or other assets offered as security may be at risk if you cannot keep up with repayments.