Leeds General Infirmary is one of the country's largest teaching hospitals, run by Leeds Teaching Hospitals NHS Trust. GME has worked with the trust for circa 10 years, delivering decorating and refurbishment across the older parts of the estate.
The current programme is focused on the buildings around the George Street entrance, running through the chapel and the Jubilee Wing and back round again. These areas had drifted into a tired state on the expectation that a replacement hospital would take over, but that build has now been pushed back to 2035. The trust needed the existing estate brought back up to standard for the long term.
Phased decorating and refurbishment across the older parts of the estate, currently focused on the George Street entrance, chapel and Jubilee Wing.

Work is delivered in phases, sequenced around the day-to-day running of a live hospital. The most recent phase covered the café, the Rotunda, the ramp and corridor spaces, and a full redecoration of the Jubilee main entrance - the busiest access point on site, which had to stay open throughout.
For the Jubilee, that meant evening shifts, phased scaffolding, barriers and controlled safety zones so patients, staff and visitors could keep moving through. Everything was cleared down at the end of each shift, with nothing stored on site overnight.
Materials were specified for a clinical environment: water-based acrylic eggshells with low odour, quick drying times, easy-clean surfaces and antibacterial properties.
An older section of a major teaching hospital brought back up to standard, ready for the years still to run before a new-build replacement arrives. Feedback from the trust has been consistent across the programme: high-quality workmanship, safe and respectful conduct in clinical areas, and sites left clean, clear and properly barriered at the end of every shift.
The relationship continues, with three to five operatives on site each month. The next phase moves to the St George's entrance, a listed part of the estate that will need council and planning approval before decorative work can begin. Off the back of the LGI programme, GME is now in conversation about further work across Leeds Teaching Hospitals sites at Pinderfields, Wakefield and Dewsbury.

















Askham Bryan College

Redecorating student accommodation, covering 63 bedrooms, kitchens and corridors, delivered to a high-quality finish with real-condition results.
Bannatyne Health Clubs

National refresh of health club interiors and exteriors, completed out-of-hours with zero disruption to members.
Bradford student accommodation

Using a phased approach on the full redecoration of a 40-bedroom student block - to a tight programme.
Carlton Academy

Stripping back varnish entirely and redecorating a school from scratch, during half-term.
Chocolate Works & LiLAC - Care Home Decorating

Two care home decorating programmes - 42 bedrooms at a listed York landmark and 12 years of maintenance across 11 LiLAC sites in Leeds.
Doncaster Royal Infirmary

Enhancing clinical environments across a busy NHS hospital with vibrant, safe finishes and minimal disruption.
DoubleTree by Hilton Hotel Leeds City Centre
.jpg)
Year-long phased decoration programme across a full-service city-centre hotel.
Health Clinic Wakefield

Delivering sensitive refurbishment at a five-storey community clinic while supporting day-to-day operations.
iQ Huddersfield
.jpeg)
350-bedroom student accommodation redecoration in a six-week summer window.
Kirk Balk Academy

Consistently delivering a long-term decorating contract across an 11-school estate.
Leeds General Infirmary - NHS Hospital Decorating Programme

A circa 10-year decorating and refurbishment programme across the older parts of Leeds General Infirmary, delivered around a live hospital.
New Lodge Housing Estate

Improving 250 council homes for Berneslai Homes with coordinated redecoration and tenant-first delivery.
Springwell School

We developed a decorating specification that balanced the right aesthetic with the practical resilience the setting required.
The Green, University of Bradford

Seventy-five bedrooms delivered in two-and-a-half weeks against a three-week deadline.
Ulster Yarns

Refurbishing a 3,600 sq ft factory with specialist coatings and minimal disruption to ongoing textile operations.
University of Huddersfield

Transforming learning and heritage spaces across a major university campus with smart, coordinated delivery.
Village Hotels - Leeds North and Wirral

Phased redecoration of 99 bedrooms and communal areas across two sites,

Mr Samuel David Peel, trading as CP Business Finance (FRN: 1034961), is an appointed representative of White Rose Finance Group Limited (FRN: 630772), which is directly authorised and regulated by the Financial Conduct Authority. CP Business Finance acts as a credit broker, not a lender. Please consider borrowing decisions carefully — property or other assets offered as security may be at risk if you cannot keep up with repayments.